The modular wheel
Complete assembly and testing. The results will determine the next steps, the equipment needed for production and its cost.
REBUILDING PLAN
To resume tire filling for unmanned ground vehicles (UGVs), we need our own production site, new equipment and funding for the first months of operation.
View the budgetWHERE WE ARE NOW
We are clearing the former workshop site and documenting the losses. Funding to begin rebuilding is not yet secured. Buying land, construction and equipment purchases are still ahead.
How to help nowORDER OF WORK
Purchase land and build the facility. Qualified specialists must design protective measures, shelter, utilities and backup power, then check readiness before the workshop opens.
Scale: ≈ 500 m² of production space and supporting roomsAcquire a new tire-filling machine and supporting equipment. Set up workstations, install the systems, complete acceptance checks and train the team.
Outcome: installed equipment that has passed acceptance checksPrepare materials, commission the equipment and check the process. Resume established gel / polymer tire filling, with funding for the team and regular stock replenishment.
Outcome: a tested process and a trained teamESTIMATED REBUILDING COST
Estimated funding requirement
≈ 6.44 million USD
The complete restart of tire filling: a new production site, equipment and the first six months of operation after launch.
This is a preliminary planning estimate. Much of the budget consists of allowances that will be refined through detailed design and supplier quotations.
We can discuss support for an agreed part of the plan. Preparing the production site comes first. Before a contribution for a specific purpose, we will agree on the need, what must happen first, the amount, documents and reporting.
Our own site, about 500 m² of production space, storage and an outdoor working area. The size of supporting rooms will be determined during planning; the future location remains confidential.
New equipment with installation, training and a service allowance. Warranty terms will be set out in supply contracts.
The team, engineering roles, materials and six months of operating costs. Future revenue is not deducted from this estimate.
All amounts are in US dollars (USD), rounded to the nearest thousand.
The reserve is included in the total. This estimate covers rebuilding and the initial restart; series production of new wheel developments will need a separate plan.
AFTER THE ESTABLISHED PROCESS RESTARTS
Complete assembly and testing. The results will determine the next steps, the equipment needed for production and its cost.
Replace the lost equipment for foamed materials, check the process and continue work on reducing wheel weight.